Quality in CNC machining is not a final inspection event — it has to be controlled before and during production. This article explains the four-stage quality flow every Yuanda order follows.
1. Incoming inspection (IQC)
Material certificates are verified against the purchase specification before material is released to the floor. Incoming materials also undergo dimensional, hardness and, where required, physical/chemical checks, so non-conforming material never enters production.
2. In-process control (IPQC)
Operators self-check the first article of every setup, while QC staff run timed patrol inspections with real-time control of every critical process dimension. Tool wear, fixture condition and program changes are monitored during the run, not just after it.
3. Final inspection (OQC)
Finished parts pass full-characteristic dimensional checks on CMM and optical equipment (VMS, height gauges, micrometers, bore and pin gauges) to ensure zero-defect shipment. Surface finish is verified with roughness testers and hardness with Rockwell/Vickers testers where specified.
4. End-to-end traceability
Every batch carries a unique identifier linking material heat/lot, process records, operator and inspection data. When a shipment reaches your incoming inspection, any dimension or material question can be traced back to the source within minutes.
Documents shipped with every order
- Full dimensional inspection reports and First Article Inspection reports (FAIR)
- Material certificates / COA
- Surface-treatment and plating certificates where applicable
Need a copy of our quality manual or a sample inspection package? Request them through our contact page and we will send the documents for your supplier audit.
Have a project like this?
Send us your drawings and specifications — our engineering team replies within 24–48 hours with a detailed quotation and DFM feedback.
Request a Quote